METHODS

On this page we will explain some of the most common methods used in Lean Manufacturing:

Quick Changeover – SMED

SMED is the term used to represent the Single Minute Exchange of Die or setup time that can be counted in a single digit of minutes. SMED is often used interchangeably with “quick changeover”. SMED and quick changeover are the practice of reducing the time it takes to change a line or machine from running one product to the next.

In het Archief

Clef two-factor authentication